Combined Synopsis/SolicitationTotal Small Business Set-AsideClosedDeadline passed
TARC Building 1 Roof Replacement
DEPT OF DEFENSE › DEPT OF THE ARMY › W39L USA NG READINESS CENTER
Key details
- 917426dc655a40fbb1a899c72ef39fdf
- W9133L26QA018
- Sep 15, 2026
- 238160 — Roofing Contractors
- Z1AA — Maintenance Of Office Buildings
- Total Small Business Set-Aside
- Arlington, VA, 22204, USA
- ARLINGTON, VA, 22204-1382
Description
Update 8/26/2026: See attached Solicitation Amendment 03 for details. The only change is an update to PoP in section 00 00 00 of the solcitiation. Period of Performance is revised through the Soliciation and SoW to 220 days. Quote due date not extended - Quotes Due August 31st, 2:00pm EDT. Note: Amendment 0003, Conformed copy of the solicitation, shows the complete solicitation with all amendment updates. Update 8/24/2026: This update includes Solicitation Amendment 02, updated Statement of Work, and responses to RFIs 1-33. See attached Amendment 0002 for full details. All changes are captured in the "Summary of Changes" on page 2 of the amendment, and are also highlighted in yellow for convenience. In Summary, the changes are: 1. Period of Performance changed from 180 to 220 days. 2. Gutter references were removed from the solicitation, section 00 00 00, Key Performance Requirements - #4. 3. Add attachments: Attachment #7 – E-51 Lightning and Grounding Plan, and Attachment #8 – E-52 Lightning Protection. "TARC Roof Repair - RFI Responses 1-33 (20260824)" replaces previously posted RFI responses. Note: Statement of Work changes are highlighted in yellow for convenience of identifying changes. Update 8/17/2026: This update includes responses to all RFIs received, 1-18. "TARC Roof Repair - RFI Responses 1-18 (20260817)" replaces previously posted RFI responses. Update 8/11/2026: This update includes posting of Site Visit Attendance Sheet and Pre-Quote Conference Slides, as well as RFI responses 1-12, 14, 17 & 18. Update 8/5/2026: See attached Amendment 0001 for full details. All changes are captured in the "Summary of Changes" on page 2 of the amendment, and are also highlighted in yellow for convenience. Summary of Changes include the following: 1. Update Quote due date to 31 August 2026, 2:00pm EDT 2. Add Project Magnitude: $1M - $3M 3. Change RFQ to RFI (Typographical error on page 6) PROJECT TITLE: TARC BLD 1- ROOF REPAIR PROJECT LOCATION: ARLINGTON, VA THIS IS A COMPLETE TEAR-OFF AND REPLACEMENT PROJECT DESIGNED TO PROVIDE A NEW, WATERTIGHT, AND ENERGY-EFFICIENT ROOF SYSTEM THAT COMPLIES WITH ALL APPLICABLE STATE AND LOCAL BUILDING CODES. THE MAJORITY OF THE WORK WILL CONSIST OF ROOF SYSTEM REMOVAL, DRAIN AND PENETRATION REPLACEMENT, ROOF SYSTEM INSTALLATION, SHEET METAL AND FLASHING INSTALLATION, AND ANCILLARY WORK PER THE SCOPE OF WORK. THIS ACQUISITION IS CONSIDERED COMMERCIAL CONSTRUCTION AND FAR 12 PROCEDURES WILL BE UTILIZED AS APPLICABLE. 1. RESTRICTED: 100% SMALL BUSINESS SET-ASIDE 2. NAICS 238160 - SIZE STANDARD: $19M 3. SITE VISIT - SEE SECTION 00 21 00 INSTRUCTIONS FOR DETAILS THIS PROJECT IS BEING SOLICITED IN ACCORDANCE WITH REVOLUTIONARY FEDERAL ACQUISITION REGULATION OVERHAUL (RFO FAR) SUBPART 12.201-2, OTHER PROCEDURES, FOR ACQUISITION OF COMMERCIAL CONSTRUCTION SERVICES IN CONJUNCTION WITH RFO FAR 36.101-1(A), AND DFARS RFO DEVIATIONS 236. AWARD WILL BE MADE TO THE RESPONSIBLE OFFEROR WHOSE QUOTE CONFORMS TO THE SOLICITATION AND IS MOST ADVANTAGEOUS TO THE GOVERNMENT CONSIDERING ONLY PRICE AND PRICE RELATED FACTORS. SOLICITATIONS, INFORMATION NOTICES, AND AMENDMENTS FOR THIS SOLICITATION WILL BE POSTED AT HTTPS://SAM.GOV.
Documents 18
- Amendment 0003 - W9133L26QA018 -Conformed Copy - 20260826.pdf6.3 MB
- Amendment 0003 - W9133L26QA018 - 20260826.pdf3.8 MB
- Amendment 0002 - W9133L26QA018 - 20260824.pdf594 KB
- Amendment 0001 - W9133L26QA018 - 20260805.pdf1.7 MB
- TARC Roof Repair - Solicitation - W9133L26QA018 - Final 20260731.pdf31.3 MB
- TARC Roof Repair - RFI Responses 1-33 (20260824).pdf136 KB
- TARC Roof Repair - Pre-Quote Conference - Site Visit Slides 20260810.pdf490 KB
- TARC Roof Repair - Site Visit - Attendance Sheet 20260810.pdf432 KB
- Attachment 1 - TARC 1 Roof Plans.pdf4.8 MB
- Attachment 2 - P-10 East Penthouse.pdf1.9 MB
- Attachment 3 - P-11 East Penthouse.pdf1.7 MB
- Attachment 4 - P-25 West Penthouse.pdf2.1 MB
- Attachment 5 - P-26 West Penthouse.pdf2.0 MB
- Attachment 6 - Overall Roof Graphic.jpg12.5 MB
- Attachment 7 - E-51 Lightning and Grounding Plan.pdf141 KB
- Attachment 8 - E-52 Lightning Protection.pdf155 KB
- Attachment 9 - 20260824 TARC 1 Roof Replacement - SOW - Rev 1.pdf161 KB
- Attachment 10 - Wage Determination VA13.pdf79 KB
Files download directly from SAM.gov.