A newer notice for solicitation FA480326B0010 was posted on Aug 26, 2026. Well 4 PFAS/PFOA Upgrade
Well 4 PFAS/PFOA Ion Exchange System Upgrade at Shaw AFB
Original title: Well 4 PFAS/PFOA Upgrade
DEPT OF DEFENSE › DEPT OF THE AIR FORCE › FA4803 20 CONS LGCA
At a glance
The Air Force seeks design and construction services to install an Ion Exchange Resin System and upgrade Well 4 at Shaw Air Force Base, South Carolina, addressing PFAS/PFOA contamination. This $5M–$10M project is a total small business set-aside under NAICS 237110 with a 508-calendar-day performance period. Mandatory site visit attendance is required by July 29, 2026, and bids are due September 8, 2026; award is contingent on fund availability.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- a55fb1be0d2e4c05bb159ab81d9300cc
- FA480326B0010
- Sep 23, 2026
- 237110 — Water And Sewer Line And Related Structures Construction
- Z2NE — Repair Or Alteration Of Water Supply Facilities
- Total Small Business Set-Aside
- Shaw AFB, SC, 29152, USA
- SHAW AFB, SC, 29152-5125
Description
Documents 21
- Amended Solicitation SF 1442-FA480326B00100001.pdf744 KB
- Solicitation Amendment 001-FA480326B00100001 SF 30.pdf419 KB
- Attachment 01-SOW-VLSB 24-0058 DATE 08-12-2026.pdf1.2 MB
- Attachment 02-Blank Pricing Sheet-VLSB 24-0058 Well 4-12 Aug 26.xlsx15 KB
- Attachment 03 - Base Access Request - 14 May 2026.pdf451 KB
- Attachment 04 - Contractor Memo - 16 Apr 2024.pdf286 KB
- Attachment 05-Well 4 Site Utilities Overview.pdf402 KB
- Attachment 06-Well Site Building-Tank Pictures.pdf3.1 MB
- Attachment 07-Additional Site Overview Photo.pdf131 KB
- Attachment 08-Ltd. Asb. Survey Report 5-07-2026.pdf6.5 MB
- Attachment 09-A_E_C_CAD Standard.pdf2.2 MB
- Attachment 10-Shaw AFB Design Constr Change 2 dated 21 Aug 2018.pdf6.9 MB
- Attachment 11-ufc_3_410_04_2017.pdf3.0 MB
- Attachment 12-ufc_3_810_01_2025.pdf527 KB
- Attachment 13-ufc_3_410_01_2025_c1.pdf527 KB
- Attachment 14-ufc.pdf716 KB
- Attachment 15-WD-SC2026-0030 Mod 1-18 May 26.pdf61 KB
- Attachment 16-DD Form 1354 - AUG 2022.pdf96 KB
- Attachment 25-Ltd. Asb. Survey Report 5-07-2026.pdf6.5 MB
- Attachment 26-Soil Sample Base Water Tower 4 6-25-26.pdf7.2 MB
- Attachment 27-Wells 4 PFAS PFOA - Site Visit Questions-17 Aug 26.pdf139 KB
Files download directly from SAM.gov.