Skip to main content
Pragmonica
SolicitationTotal Small Business Set-AsideActive7 days

A newer notice for solicitation FA480326B0010 was posted on Aug 26, 2026. Well 4 PFAS/PFOA Upgrade

Well 4 PFAS/PFOA Ion Exchange System Upgrade at Shaw AFB

Original title: Well 4 PFAS/PFOA Upgrade

DEPT OF DEFENSE › DEPT OF THE AIR FORCE › FA4803 20 CONS LGCA

At a glance

The Air Force seeks design and construction services to install an Ion Exchange Resin System and upgrade Well 4 at Shaw Air Force Base, South Carolina, addressing PFAS/PFOA contamination. This $5M–$10M project is a total small business set-aside under NAICS 237110 with a 508-calendar-day performance period. Mandatory site visit attendance is required by July 29, 2026, and bids are due September 8, 2026; award is contingent on fund availability.

AI-generated summary — verify details in the original notice below and on SAM.gov.

Key details

Notice ID
a55fb1be0d2e4c05bb159ab81d9300cc
Solicitation #
FA480326B0010
Posted
Response deadline
Archive date
Sep 23, 2026
NAICS
237110 — Water And Sewer Line And Related Structures Construction
PSC
Z2NE — Repair Or Alteration Of Water Supply Facilities
Set-aside
Total Small Business Set-Aside
Place of performance
Shaw AFB, SC, 29152, USA
Contracting office
SHAW AFB, SC, 29152-5125

Description

***Notice to Offeror(s)/Supplier(s): Funds are not presently available for this contract. No award will be made under this solicitation until funds are available. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer. The Government reserves the right to cancel this solicitation, either before or after the closingdate. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.*** ***THIS SOLICITATION HAS BEEN AMENDED. PLEASE SEE AMENDMENT FA480326B00100001 FOR DETAILS. DUE TO FILE SIZE LIMIT, ATTACHMENT 24-WELL 3 FINAL REPORT MUST BE SENT SEPARATE VIA DOD SAFE LINK. PLEASE SEND REQUEST FOR THIS ATTACHMENT TO MR. CARLOS GRIGGS AT carlos.griggs.1 @us.af.mil or MR. DARREL FORD AT darrel.ford.3@us.af.mil. Please ensure to provide email address to send attachment with your request.*** This requirement is for the design and construction to install a Ion Exchange (IX) Resin System and upgrades to the Base Well 4 System in accordance with Statement of Work, dated 12 August 2026. Period of Performance: 508 Calendar Days Total. 160 Calendar Days after Notice to Proceed issuance for Design Phase. 288 Calendar Days after Notice to Procced issuance for Construction Phase. 60 Calendar Days for Contract Closeout procedures. Competition: This requirement is a 100% Small Business Concern Set Aside for North American Industry Classification System (NAICS) code 237110. The Magnitude of this requirement in accordance with Federal Acquisition Regulation (FAR) Overhaul 36.204(g) is valued between $5,000,000.00 and $10,000,000.00. ***A site visit is scheduled on Wednesday, 29 July 2026 / 09:00 A.M. (local) EST. Site visit meeting location is the 20th Contracting Squadron, Bldg 216 parking lot. The address is 321 Cullen Street, Shaw AFB, SC 29152. SITE VISIT ATTENDANCE FOR PRIME CONTRACTORS COMPETING FOR AWARD IS MANDATORY! Any bids from offerors who did not attend mandatory site visit will not be accepted. Please refer to attachments 03 and 04 to ensure to adhere to all requirements necessary to obtain a pass to access the installation. Please email completed base pass request forms to the Contracting Officer and Contract Specialist at earliest opportunity but no later than Friday, 24 July 2026, 1:00 PM (local) EDT. Please arrive to the installation 30-45 minutes prior to site visit meeting time to allow enough time to process through Installation Visitor Control Center. Base passes cannot be requested the day of site visit. Retired military identification cards cannot be used to access installation for contractor business. Escorts will NOT be provided. Attachments 17 through 23 are in .dwg format and cannot be supported on the SAM.gov platform. These attachments can be provided directly to requestors upon request. *** ***All questions for this solicitation will be due no later than Wednesday, 5 August / 9:00 A.M. (local) EST. Submit questions to the Contract Specialist, Mr. Carlos Griggs at carlos.griggs.1@us.af.mil and Contracting Officer, Mr. Darrel Ford at darrel.ford.3@us.af.mil*** ***Bids for this solicitation are due no later than Tuesday, 8 September 2026 / 10:00 A.M (local) EST. ***ONLY HARDCOPY SEALED BIDS WILL BE ACCEPTED be accepted through this solicitation posted on SAM.gov. Bids can be hand delievered to Mr. Carlos Griggs or Mr. Darrel Ford located at the 20th Contracting Squadron, 321 Cullen Street, Building 216, Second Floor, Infrastructure Flight, Room 203. Bids can also be mailed to the follow: 20th Contracting Squadron, 321 Cullen Street, Shaw AFB, SC 29152 Attention Mr. Carlos Griggs or Mr. Darrel Ford, Infrastructure Flight, Room 203. Hand delivered and mailed bids must be acknowledged received before the solicitation due date and time.

Documents 21

Files download directly from SAM.gov.