SolicitationTotal Small Business Set-AsideActive16 days
A newer notice for solicitation FA940126R0023 was posted on Aug 26, 2026. SOR Waterline Repair
SOR Waterline Repair and Construction at Kirtland AFB
Original title: SOR Waterline Repair
DEPT OF DEFENSE › DEPT OF THE AIR FORCE › FA9401 377 MSG PK
At a glance
The Air Force seeks a small business to design and build approximately 7,900 feet of 8-inch ductile iron waterline, tanks, pump stations, and SCADA controls at Kirtland AFB, New Mexico. A mandatory site visit is scheduled for September 3, 2026, requiring attendee details by August 28, 2026. Proposals are due by September 17, 2026.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- bcb3a338b50e4e0b806cd84674066819
- FA940126R0023
- Oct 2, 2026
- 237110 — Water And Sewer Line And Related Structures Construction
- C1NE — Architect And Engineering- Construction: Water Supply Facilities
- Total Small Business Set-Aside
- Kirtland AFB, NM, 87117, USA
- KIRTLAND AFB, NM, 87117-0001
Description
The primary purpose and objective of this project is to outline the scope for the design and construction of a new 7,900 feet high-pressure waterline, appurtenant systems, and associated control systems on the southeast side of KAFB. This project shall provide a robust and reliable water supply from Pump Station 2 (PS2) to the SOR and HERTF reservoirs, replacing and upgrading existing infrastructure. This includes an 8-inch, Class 350 Ductile Iron Pipe (DIP) with cement-mortar lining and an asphaltic seal coat and all associated valves and fittings, upgrade the existing control system to add SCADA to the newly installed system, Portable Hoist for Pump and Motor Maintenance, a new 15,000-gallon tank to include a booster pumps to be installed prior to the PS2, and a new 5,000-gallon tank and pre-packaged pump station at the SOR site. A site visit will be held on 03 September 2026 at 1300 MST and all parties will meet at the Truman Gate Visitors Center to be sponsored onto base at 1200 MST. Please submit the full names, date of birth, and citzenship of your attendees NLT COB 28 August 2026 and advise if you require base passes to access Kirtland AFB to the Mrs. Abigail Crespin, abigail.crespin@us.af.mil and TSgt Hillarie Johnson, hillarie.johnson@us.af.mil. All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency. Equitable Adjustments will be IAW RFO 52.212-4. Contractor Access to CUI attachments: If a contractor is accessing request to a restricted, government only document, they would need to submit the DD2345 for their company as part of their request. The justification (relevant business activity) in Block 4 of the DD2345 is used to determine access to controlled information they are requesting. Typically, companies include something about bidding on contracts as part of their relevant business activity. Submit a completed copy of the DD 2345 to the JCP link.
Documents 13
- Solicitation - FA940126R0023.pdf708 KB
- Ombudsman and Contractor Access.pdf94 KB
- Statement of Work - SOR Waterline Repair.pdf269 KB
- Wage Determination - 08-10-2026.pdf238 KB
- Evaluation Factors R2-250008-Repair SOR Waterline.pdf134 KB
- 01d. Attachment D-Basis of Design Requirements 7 15 2026.pdf945 KB
- 01d. Attachment D-Basis of Design Requirements 7 15 2026.docx240 KB
- 01e. Attachment E - KAFB Low and Medium-Voltage Electrical Design and Equipment Requirements_2025.pdf179 KB
- 02. Front End Specifications.pdf8.2 MB
- 03. Blank Form for Contractor_s Proposal.xlsx74 KB
- 03. Blank Form for Contractor_s Proposal.pdf203 KB
- 04. DD2345 JCP Guide.pdf798 KB
- 04a. DD 2345.pdf61 KB
Files download directly from SAM.gov.